Easy-Fire Pottery Kilns

Easy-Fire Pottery Kilns

Easy-Fire Kiln

The L&L Flagship Kiln

Easy to use, install, and maintain

1) Genesis Touch Screen Control intuitive programming, comes with a free app for monitoring kiln

2) Hard Ceramic Element Channels protect elements and fragile firebrick, improves kiln life dramatically

3) Piggy-back Control Panel makes servicing easy and safe and keeps electronics cool

4) Ceramic Terminals make changing elements easy without crimping

5) Protected Thermocouple for worry-free loading

6) Solid Ceramic Peephole Plug - no chance of falling out (not shown in photo)

7) Spring-Lift lid - easy to lift, no support bar restricting loading

8) Stainless Steel Case

9) Full Support Stand extends the life of the bottom brick

3" brick adds strength and insulation for increased energy efficiency

 

Perfect for Potters

 

MSRP: $2,600
Small (1.5 cubic feet)
Top-Loading
Cone 10, 2350F, 1290C
Genesis Multi-Zone Touchscreen Control
240 Volts, Single Phase
Fuse Size: 20 Amp, Watt: 3840
Lead Time: 8 to 10 Weeks
MSRP: $2,990
Small (2.5 cubic feet)
Top-Loading
Cone 10, 2350F, 1290C
Genesis Multi-Zone Touchscreen Control
240 Volts, Single Phase
Fuse Size: 30 Amp, Watt: 5,740
Lead Time: 8 to 10 Weeks
MSRP: $3,250
Small (3.2 cubic feet)
Top-Loading
Cone 10, 2350F, 1290C
Genesis Multi-Zone Touchscreen Control
240 Volts, Single Phase
Fuse Size: 50 Amp, Watt: 8,000
Lead Time: 8 to 10 Weeks
MSRP: $3,950
Small (3.7 cubic feet)
Top-Loading
Cone 10, 2350F, 1290C
Genesis Multi-Zone Touchscreen Control
240 Volts, Single Phase
Fuse Size: 50 Amp, Watt: 8,400
Lead Time: 8 to 10 Weeks
MSRP: $4,135
Medium (4.4 cubic feet)
Top-Loading
Cone 10, 2350F, 1290C
Genesis Multi-Zone Touchscreen Control
240 Volts, Single Phase
Fuse Size: 50 Amp, Watt: 9,460
Lead Time: 8 to 10 Weeks
MSRP: $4,655
Medium (5.5 cubic feet)
Top-Loading
Cone 10, 2350F, 1290C
Genesis Multi-Zone Touchscreen Control
240 Volts, Single Phase
Fuse Size: 60 Amp, Watt: 11,520
Lead Time: 8 to 10 Weeks
MSRP: $4,990
Medium (6.7 cubic feet)
Top-Loading
Cone 10, 2350F, 1290C
Genesis Multi-Zone Touchscreen Control
240 Volts, Single Phase
Fuse Size: 60 Amp, Watt: 11,520
Lead Time: 8 to 10 Weeks
MSRP: $4,940
Medium (6.8 cubic feet)
Top-Loading
Cone 10, 2350F, 1290C
Genesis Multi-Zone Touchscreen Control
240 Volts, Single Phase
Fuse Size: 60 Amp, Watt: 11,500
Lead Time: 8 to 10 Weeks
MSRP: $5,305
Medium (8.5 cubic feet)
Top-Loading
Cone 10, 2350F, 1290C
Genesis Multi-Zone Touchscreen Control
240 Volts, Single Phase
Fuse Size: 60 Amp, Watt: 11,520
Lead Time: 8 to 10 Weeks
MSRP: $5,800
Medium-Large (10.2 cubic feet)
Top-Loading
Cone 8, 2280F, 1250C
Genesis Multi-Zone Touchscreen Control
240 Volts, Single Phase
Fuse Size: 60 Amp, Watt: 11,520
Lead Time: 8 to 10 Weeks