PDF Library printer-friendly page icon

PDF Library

PDF Liberary

Complete technical instructions for DynaTrol (until 4/2003)
This is the cone type kiln sitter control used on the old B Model kilns
Genesis Touch Screen Control Instruction Manual (Ver: 3-3-16)
Simple listing of features of DynaTrol 700
Basic operating instructions for all L&L kilns using a One-Touch™ control board. Written for Deg C users.
Basic operating instructions for all L&L kilns using a One-Touch™ control board. Written for Deg F users.
Instructions for Tru-View Multi-zone Pyrometer System
How to use the Vent-Sure on other kilns
Installation and Operation Instructions for Vent-Sure Kiln Vent
Step by step set up and assembly instructions.
Step by step assembly instructions.
Step by step assembly instructions for both Easy-Fire and School-Master kiln lines.
Step by step assembly instructions for Jupiter Automatic kilns.
Step by step assembly instructions.
Step by step set up and assembly instructions.
Easy-Load Front-Loader Shipping Checklist

The unpacking portion of this checklist only applies to the special crate used in the continental USA and Canada. eFL kilns shipped to Hawaii, Alaska, Puerto Rico, Mexico, and other international destinations will be packed in an ISPM-15 plywood crate and will need a forklift to install the kiln.

Easy-Load Front-Loader Shipping Form
Installation instructions for both the Easy-Fire and School-Master kiln lines. Revision:4-15-12
Kiln Interface & Datalogger Software System (K.I.S.S.)
Specifics on the Pyrocil Sheathed Metallic Thermocouples used with L&L kilns.
Specifics on the Type S Platinum Thermocouples used with L&L kilns.