Installation

warning: Creating default object from empty value in /home/hotkilns/public_html/modules/taxonomy/taxonomy.pages.inc on line 33.

How to vent your kiln if you do not have a downdraft vent like the Vent-Sure?

Although we strongly recomment using the Vent-Sure downdraft vent there are some kilns that do not have them.

Changing Phase on an Easy-Fire Kiln (Video)

Category: 
Repair & Diagnose Controls and Power
Thumbnail: 
Video: 
Teaser Text: 
This video shows how to change the transformer on most L&L automatic kilns
Relationships

This video shows how to change phase on an L&L Easy-Fire kiln. It will similar on most other L&L kilns with power cords.

What is Branch Fusing and where is it used?

Branch Fusing Included On High Powered Units

  • According to the the National electrical Code electrical equipment needs branch fusing when the total amperage draw is higher than 48 amps.

Front-Loader Shipping Quote Form

Teaser Text: 
This is the information we need to quote shipping for a Hercules or Easy-Load Front-Loading Kiln
Include with Instructions PDF: 
Instructions
Category: 
Installation
File Size: 
110.87 KB
Relationships

Also see the 

How to handle power interruptions, blackouts, and bad electrical power grids

In some places the electrical power is very inconsistent with power outages, interruptions, blackouts, voltage spikes, voltage drops, or excessive environmental line noise (such as is caused by lar

Syndicate content